Saturday, November 21, 2026North Texas
380 Daily
THIS WEEKENDNov 20–Nov 22

Aubrey to consider $755,270 downtown drainage contract November 19

AI-generated conceptual concrete stormwater culvert and drainage channel for Aubrey’s proposed downtown drainage contract.
On this page

Aubrey City Council will consider a $755,270.38 construction contract for the Downtown Retention Pond and Sherman Street Culvert project at 6 p.m. Thursday, November 19, at 226 Countryside Drive. City staff recommend Armor Site Services, the lowest of eight bidders. The award is pending council action.

The November 19 council packet contains the staff recommendation and bid tabulation. Aubrey’s original reporting also covered the bids and proposed work.

What the drainage project includes

The staff report describes a pond with about 6.3 acre-feet of storage, 163 linear feet of 7-foot-by-3-foot box culvert and 54 linear feet of 48-inch reinforced concrete pipe. It also lists two impact basins. The bid documents include sidewalk, pedestrian handrail and pavement replacement.

For people using Sherman Street, the proposed culvert work is the part to watch for construction access notices. The packet describes open-cut installation. It does not establish a current road closure or a published detour. Check city notices before changing your route.

How the bids compare

The city opened bids October 28 after advertising the project October 9 and 16. The staff report lists Armor at $755,270.38, followed by Mann Robinson & Son at $877,054.32 and Matco at $887,402.87. The highest listed bid was $1,914,271.40 from Precision Road Services.

These are competing offers for the project. The recommended amount is a proposed contract ceiling pending approval. Staff say they checked the low bidder’s qualifications and references and received no negative responses.

What residents can check next

Look for the council’s recorded action on agenda item 25, then for an executed contract and city construction notices. The staff report gives no confirmed construction start or completion date. A bid award would be a separate step from crews starting work.

The city’s Streets and Drainage page explains which streets and drainage areas Public Works maintains. For parks, libraries and activities nearby, see the Aubrey kids guide.

Continue reading